BUILDING relationships • innovation • excellence
News and Press
Home > News and Press
Apr 2018
Aerolease Associates Hangar 4 - SFVBJ Commercial Real Estate Awards
Gold Award for Best Industrial Project

Featured in the San Fernando Valley Business Journal. SFVBJ's Commercial Real Estate Awards Gold Award Winner for Best Industrial Project.

Apr 2014
T. Violé Construction is ranked as #9 in Tonnage and #18 in Square Footage on Metal Construction News Magazine’s 2013 Top 100 Metal Builders List

For link to article, please click here.

Apr 2014
Landmark Aviation Safety Award
San Diego International Airport

Safety Award presented by Turner Construction to T. Violé Construction in recognition of outstanding achievements and tireless efforts in contributing to L.I.F.E (Live Injury Free Everyday) on the Landmark Aviation Project.

For link to article, please click here.

Jan 2014
Notre Dame High School Baseball Stadium article and video highlights project on Los Angeles Times Website

T. Violé Construction article and project video featured on the Los Angeles Times / Sports website, January 2014. Follow the link below to view article and video.

http://www.latimes.com/sports/varsity-times/la-sp-vi-baseball-3-million-sherman-oaks-notre-dame-field-is-nearing-completion-20140121,0,5377853.story#axzz2r5U7Mamr

Dec 2013
SPACE SHUTTLE ENDEAVOUR ORBITER HOLDING FACILITY INCLUDED IN METAL BUILDING MANUFACTURER'S ASSOCIATION (MBMA) 2013 ANNUAL REPORT "TRANSFORMING THE CONCEPTS OF METAL BUILDINGS GAME CHANGERS" ISSUE.

For link to article, please click here.

Apr 2013
Space Shuttle Endeavour Orbiter Holding Facility featured in Butler Manufacturing's Building Profit Magazine

TVC's Space Shuttle Endeavour Orbiter Holding Facility project at the California Science Center in Los Angeles was featured as the cover article of the Spring 2013 issue of Butler Manufacturing's Building Profit Magazine.

For link to article, please click here.

Jun 2012
TVC featured in the San Fernando Valley Business Journal

T. Violé Construction featured in the June 11, 2012 Issue of the San Fernando Valley Business Journal.

For link to article, please click here.

Dec 2011
Lyon Air Museum Featured in Butler Manufacturing's Building Profit Magazine

TVC's Lyon Air Museum project at the John Wayne Airport in Orange County, CA was featured in the cover article of the Fall/Winter 2011 issue of Butler Manufacturing's Building Profit Magazine

For link to article, please click here.

Sep 2011
T. Violé Construction selected to build the new NetJets Terminal building at the Van Nuys Airport. This project was featured in a September 2011 article in the San Fernando Valley Business Journal.

For link to article, please click here.

May 2011
T. Violé Construction was listed as #21 in Metal Construction News Magazine’s Top 100 Metal Builders List.

For link to article, please click here.

Apr 2011
At the Butler Manufacturing Company Western Region Conference, T. Violé Construction was awarded “Builder of the Year 2010 for the Western Region” and “High Performance Builder 2010”

Jun 2009
Metal Architecture News highlights Martin Aviation’s Lyon Air Museum at the John Wayne Airport in Santa Ana, CA

Apr 2009
Metal Architecture News highlights Maguire Aviation’s hangar at the Van Nuys Airport in Van Nuys, CA

Recently Started / Upcoming Projects

Mar 2017

Structural steel framing, metal roof and floor decking systems for a 48,184 sq. ft. of single story Process Building, a 24,880 sq. ft. Administration and Learning Center and an 8,000 sq. ft. Chemical Storage Facility.

Jul 2018

A one and two story office building totaling approximately 58,000 sq. ft. Includes open air patio/garden area on mezzanine level, six large skylight units and tow open wall assemblies covered by aircraft style bifold doors. Natural day lighting achieved with the use of translucent wall and roof panels, two color - exterior single skin PBR wall and roof panels.

Mar 2015

Construction includes a 17,000 sq. ft. medical office building, as well as an additional 17,000 sq. ft. professional office building. All related site work is eco-friendly.

Recently Completed Projects

Apr 2018

16,626 sq. ft. of new warehouse building and canopy. A 1-story, Type III-B pre-engineered metal warehouse building including a 2nd floor of 1,671 sq. ft. and roof extension for exterior storage of 4,420 sq. ft. The 2nd floor and a portion of the area below houses 2,619 sq. ft. of accessory offices and related spaces.

Jan 2018

A 7,000 sq. ft. soundstage with a 40 ft. high clear grid iron level built within an existing one story warehouse building. 97 ft. x 93 ft. footprint with a 47 ft. high ridge line.